Project Detail

Thermal insulation cylindrical stainless steel tank tank  

Thermal insulation cylindrical stainless steel tank tank is project number 513687
posted at Freelancer.com. Click here to post your own project.

 

| More Free Trial For New Buyers
 

Status:

Selected Providers: katudeni

Budget: $30-250

Created: 09/23/2009 at 5:31 EDT

Bid Count: 9

Average Bid:
$ 215

09/26/2009 at 5:31 EDT

Project Creator: hycomfg
Employer Rating: 10/1010/1010/1010/1010/1010/1010/1010/1010/1010/10 (24 reviews)

Bid On This Project
 

Description

We are designing a product that will include a stainless steel cylindrical pressure tank of 3L capacity which will store hot water at 110 (one hundred and ten) degrees C under mains water pressure. The tank will be 30cm tall. Radius to be calculated. The tank needs connections for 10mm hot and cold inlet/outlet connections via flexible braided hoses. The hot one at least (and probably both) must be towards the top of the tank.

The top of the tank must provide have access to a flanged electric heating element so that it can be replaced. This means it can't be buried under fixed insulation. Our main criteria are:

- Insulation losses should be very (very !) low. Our absolute maximum is 10W, but we'd like less.
- Wall thickness should be thin, so the final product is not too bulky
- Assembly should be easy, with access to the element.

Costs matter, but performance is the key. The tank will be housed in an outer case, which could be plastic or metal. The insulation would be between the tank and the case. The finish of the outer cover could be shiny if this would make a significant difference to radiation. Please consider all thermal aspects of the design in your review. There could be more than one material chosen (eg one insulation best for the tank, something to go on the element flange, something else for the pipes etc).

What we want is a brief review of the available options and a more detailed solution for the favoured material(s). You should consider aerogel materials (http://www.aerogel.com/) or http://www.cabot-corp.com/ but there may be other even better materials out there we are uaware of. Vacuum solutions are not an option for patent reasons.


Additional files submitted:
tank-full.PDF

Messages Posted:1 View project clarification board Post message on project clarification board

Bid On This Project
 

If you are the project creator or one of the bidders Log In for more options

 

240

12 days

09-24-2009 11:43 EDT

Hi, enjoy the service of an experianced engineer. Pls check our reviews and PMB. Thanks.

help

 

250

10 days

09-23-2009 12:12 EDT

plz check pm for details.

help

 

200

7 days

09-25-2009 00:29 EDT

I novice on this site, but I am able to test all variants of your article using virtual experiments in FEA and CFD software. This way you will get optimized assembly without expensive tests. CEO of Russian engineering center eSmartDATA

help

 

250

10 days

09-23-2009 12:07 EDT

(No Feedback Yet)

Since we have successfully done this sort of job earlier(it was Water softening system design for the client culligan,USA),we feel that it could be easier for us as every design process is documented. Modeling tool is not mentioned here, let us know Also Check PM. Looking forward for the favorable reply.

help

 

210

7 days

09-23-2009 12:33 EDT

(No Feedback Yet)

Dear Sir: I am responding to your advertisement GetAFreelancer. If required I will enclose my resume showing my education, experience, and background. I have over 7 years experience in the Design Engineering, Project Management and Team Management. Totally I have experience as follows: ü Handling entire gamut of task pertaining to drawings study, Modelling, Sheetmetal Modelling, Detailing, Solid Modelling and Assembly Design. ü Developing the conceptual design of new products entailing drawings & specification study, quotation enquiry study & finalization, vendor selection & finalization, schedule for development, first sample approval, tool modification and final part approval. ü Designing the product to meet customer requirement & translating the design model using various tools. ü Core Cavity extraction and electrode planning. ü Reviewing the engineering / design changes & resolving quality related problems associated with design. ü Final checking and release of engineering drawings for the development. ü Designing of cutting plan for the product. ü Creating drawings to the various departments for the mass production. ü Coordinating with Production Department for improving quality of the product. ü Developing design procedures to test existing products and equipment to identify areas for improvement. ü Recommending changes to existing products and equipment to improve specifications and performance. ü Training company staff in the operation and maintenance of products and equipment. May I arrange an interview to further discuss my qualifications? I am available for an interview at a mutually convenient time. Thank you for your time and consideration. Sincerely, Pattabhi Raman K

help

 

220

7 days

09-24-2009 09:45 EDT

(No Feedback Yet)

We can provide 100% as per the requirement which we are fully equiped and focused such similar projects

help

 

175

5 days

09-24-2009 10:35 EDT

(No Feedback Yet)

we r experienced workers! ready to start quality work!

help

 

230

20 days

09-24-2009 22:29 EDT

(No Feedback Yet)

I am 17 years experienced mechanical enginner with Autocad but new in this line If u give me a chance I shall able to do this excellent job for your lowest price

help

 

160

5 days

09-26-2009 03:02 EDT

(No Feedback Yet)

Dear Buyer It has been understood that the scope of project is Thermal insulation of cylindrical stainless steel tank with minimum insulation thickness and heat loss below 10 W. I propose myself for this work as I am fully competent with the project requirement and have experience of designing, revamping and rating of various types of process equipment such as dryer,TEMA classified heat exchangers ( please refer my profile on the site). Job will be done within the time limit agreed upon after realization of project. I can provide you excellent reference upon this from my previous organizations. respectfully Anurag Sharma

help


    Bid on this Project